27 results found
-
Improve the recalculate TSS option so it includes run power
Currently you can't recalculate run workouts with power, so if they load with the wrong threshold you have to recalculate them manually!
2 votes -
When shifting / moving planed trainings please move Notes, too!
When I'm re-arranging Plans i need do shift planed Trainings. My Coach / Training Plan works with notes. If I shift planed trainings Notes don't shift... This is a real nuisance
Thank you
Eike2 votes -
TP Details as an option to view on the calendar
Hello guys;
I would suggest that the "Datails" column in ATP could have an option to appear on the calendar, as well as the "Limiters - Run" column; TSS planned... As this would help in the construction of the weeks with information from each athlete...
It would be possible??Thanks!
Best Reguards2 votes -
More options of reference in builder
I think it would be very useful to have more reference parameters for training in the builder (for example 95% of p5', 95% of MSSL, 105% of vt1...etc).
That is, we can reference the intervals by other landmarks ( p1', p5', p20', vt1, vt2 MSSL...etc)
1 vote -
Projected Time in Each 'Zone' per Cycle (meso/micro/macro)
Total training time per ATP is only part of the equation, and not indicative of the training load. The training stimulus is the metric of importance, and how long each load is delivered per period. I am looking for the planned time in each zone, which can be tabulated based on the builder. I then want to compare planned time in each zone to actual time. 15 hours of training is a useless figure. It depends what those 15 hours are filled with and the proper loads depending on period. In the ATP it would be great to see colors…
1 vote -
Allow Multi-Select and Ability to delete metrics as a grouping
As a coach who spends alot of time on the calendar and often cleaning things up, the lack of ability to multi select items for deletion of moving is a time drain. Right now, unfortunately I have 100s of metrics that were duplicated (my bad that this happened) but right click delete move cursor to delete button, 100s of time... going to be a long time to get it cleaned up.
1 vote -
Hide assigned plans by default.
When I assign a plan to a client it would be very helpful if the assigned sessions were hidden by default on their calendars. When I assign a plan I usually go to each assignee's calendar and Hide all sessions, only un-hiding the ones I want week by week. When I assign a plan to a client who is peaking fro a second event, under the current system, all older sessions are allocated and show up in red on their calendars often causing them stress.
1 vote
- Don't see your idea?