Skip to content

TrainingPeaks Customer Feedback

Share Your Insights and Shape the Future of TrainingPeaks


At TrainingPeaks, we're committed to continually enhancing our platform to better serve your needs. Your feedback is essential in helping us achieve this goal. To submit your feedback:


  • Search for Your Idea: Before adding a new suggestion, take a moment to search for similar ideas. If you find one that matches, you can add your vote and contribute to the discussion with your comments.

  • Add Your New Idea: Have a unique suggestion? We'd love to hear it! Create a new entry with a clear title and a detailed description.

  • Rate an Idea's Importance: How important is this feature to you? Let us know by rating its importance helping drive our ever evolving roadmap.


Our product teams regularly review UserVoice contributions during our ongoing prioritization and product discovery process, so this is the best place to suggest the changes you want to see. 


Need Assistance or Want to Report a bug?


If you require assistance with TrainingPeaks or wish to report a problem, our Support Team is here to help. Please reach out to us at TrainingPeaks Support.


Stay Informed About Our Latest Features


To keep up to date with our newest feature releases and updates, visit our TrainingPeaks Feature Updates page.


TrainingPeaks Customer Feedback

Categories

JUMP TO ANOTHER FORUM

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

27 results found

  1. Currently you can't recalculate run workouts with power, so if they load with the wrong threshold you have to recalculate them manually!

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. When I'm re-arranging Plans i need do shift planed Trainings. My Coach / Training Plan works with notes. If I shift planed trainings Notes don't shift... This is a real nuisance
    Thank you
    Eike

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Hello guys;
    I would suggest that the "Datails" column in ATP could have an option to appear on the calendar, as well as the "Limiters - Run" column; TSS planned... As this would help in the construction of the weeks with information from each athlete...
    It would be possible??

    Thanks!
    Best Reguards

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. I think it would be very useful to have more reference parameters for training in the builder (for example 95% of p5', 95% of MSSL, 105% of vt1...etc).

    That is, we can reference the intervals by other landmarks ( p1', p5', p20', vt1, vt2 MSSL...etc)

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Total training time per ATP is only part of the equation, and not indicative of the training load. The training stimulus is the metric of importance, and how long each load is delivered per period. I am looking for the planned time in each zone, which can be tabulated based on the builder. I then want to compare planned time in each zone to actual time. 15 hours of training is a useless figure. It depends what those 15 hours are filled with and the proper loads depending on period. In the ATP it would be great to see colors…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. As a coach who spends alot of time on the calendar and often cleaning things up, the lack of ability to multi select items for deletion of moving is a time drain. Right now, unfortunately I have 100s of metrics that were duplicated (my bad that this happened) but right click delete move cursor to delete button, 100s of time... going to be a long time to get it cleaned up.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. When I assign a plan to a client it would be very helpful if the assigned sessions were hidden by default on their calendars. When I assign a plan I usually go to each assignee's calendar and Hide all sessions, only un-hiding the ones I want week by week. When I assign a plan to a client who is peaking fro a second event, under the current system, all older sessions are allocated and show up in red on their calendars often causing them stress.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
2 Next →
  • Don't see your idea?