67 results found
-
Beta versions
Allow users to sign up for the beta user features testing before release to provide feedback.
1 vote -
Projected Time in Each 'Zone' per Cycle (meso/micro/macro)
Total training time per ATP is only part of the equation, and not indicative of the training load. The training stimulus is the metric of importance, and how long each load is delivered per period. I am looking for the planned time in each zone, which can be tabulated based on the builder. I then want to compare planned time in each zone to actual time. 15 hours of training is a useless figure. It depends what those 15 hours are filled with and the proper loads depending on period. In the ATP it would be great to see colors…
1 vote -
Ability to periodise consecutive workouts from one screen not each individual workout
An easy way to periodise consecutive strength workouts rather than having to go into each workout and adjust. Being able to have the same workout scheduled say 4 - 8 weeks in a row, but being able to edit in one screen to periodise each of those workouts over that time instead of going into each and every workout and editing to periodise which is time consuming.
1 vote -
More options of reference in builder
I think it would be very useful to have more reference parameters for training in the builder (for example 95% of p5', 95% of MSSL, 105% of vt1...etc).
That is, we can reference the intervals by other landmarks ( p1', p5', p20', vt1, vt2 MSSL...etc)
1 vote -
Hide assigned plans by default.
When I assign a plan to a client it would be very helpful if the assigned sessions were hidden by default on their calendars. When I assign a plan I usually go to each assignee's calendar and Hide all sessions, only un-hiding the ones I want week by week. When I assign a plan to a client who is peaking fro a second event, under the current system, all older sessions are allocated and show up in red on their calendars often causing them stress.
1 vote -
Trail running programming tools
I think that there is a need for many coaches when we have to program trail runing sessions. Nowadays we can program with time or distance, but running in the mountains implies take into acsount the slope.
It's important introduce programming with slope and maximum climb speed.1 vote -
textual workout builder
build a workout using the textual description with specific syntax like intervals.icu
1 vote
- Don't see your idea?