Manual ATP, without duration limit, and with colors in the bar graph.
It would be important to better develop my work if, when planning the ATP, a minimum or maximum period of time did not have to be specified.
When planning manually, it is a hassle to have to create an ATP with a specific duration.
I think it would be interesting for the coach to select the type of work and the load in each type of week, and adjust said planning throughout the season.
Sometimes, we prepare a big event for 6-8 months, and yet, due to an injury, we have to cut that planning and look for a new event in the future. Or, we arrive at the big event and we want to extend the season with some more competition.
The time limits in which TP forces ATPs to last between 9 and 18 months are a hindrance to planning that is done manually.
It would also be useful if the different types of microcycles were associated with colors, to have a clearer view in the ATP column graph.