Color coding workouts using completed TSS instead of completed time
Please add a possibility / option to change the calculation of the color code so the TSS is used as main parameter instead of the completed time.

A workout’s compliance can now be based on duration, distance, or TSS.
Information on how to adjust this setting can be found here:
http://help.trainingpeaks.com/hc/en-us/articles/222276447-Changing-Workout-Color-Compliance-
-
sean commented
Currently if we want to get a green colour coding for a specific workout I have to aim for the time that it states i.e. 45 min swim, 1 hr bike etc. It would be nice if we could use planned 'distance' to also achieve the colour coding. For example - if I plan on going on a 90k bike and oppose to a 3 hr bike ride. Currently it doesn't matter how hard I go on the workout, if I don't do the time, I don't get the colour coding. I know I can simply change the planned time but that's kind of back to front.